The news that moves freight
Ocean Nov 27, 2026 · 7 min read

Dockworkers set six rules for port automation and AI

Dock unions draw a line around terminal software, not just cranes

The International Dockworkers Council (IDC) has adopted six minimum standards to guide bargaining over new port technology from 2026 to 2030. The decision came at its tenth General Assembly in Rio de Janeiro, held 16–20 November. More than 600 delegates attended. They represent more than 220,000 dockworkers from 108 unions in 39 countries, according to a report by El Estrecho Digital published on 25 November.

The assembly also ratified 26 new affiliates. The IDC calls this the largest expansion in its 26-year history. Dennis A. Daggett was re-elected general coordinator through 2030. The next General Assembly will be in Sydney in 2030.

Our view is simple. The most important part of this is not the robots. It is the software. Dock unions have spent a decade fighting automated cranes and driverless yard vehicles. They are now aiming at the systems that run terminals from behind a screen. That brings a wider set of terminal technology into labour talks, including the digital tools forwarders rely on.

What the six standards say

The IDC’s six standards, as reported by El Estrecho Digital, cover:

  • Employment protection.
  • Bargaining before any technology is introduced.
  • Union involvement in technology decisions.
  • Training and retraining.
  • Occupational health and safety, with accountability.
  • Union oversight of the change process.

Rollout comes in three phases. First, affiliates share information. Second, unions coordinate their responses. Third, they take joint action against technological change driven by international port companies. No strike dates or specific actions were announced.

The second standard is the one to watch. “Bargain before you implement” turns a technology decision into a negotiation. If a terminal wants to change its systems, the union expects to be at the table first, not told afterwards.

Why the target is now software

Daggett was clear about where the threat sits. He pointed past cranes and driverless vehicles to terminal operating systems, known as TOS. A TOS is the software that plans where each container sits in the yard, how a ship is loaded and unloaded, and how trucks move through the gate. AI tools are increasingly built into these systems.

“Everyone looks at the automated crane or the driverless vehicle, but nobody sees an algorithm,” Daggett said, as reported by El Estrecho Digital.

He argued that these systems can collect decades of expertise from planners, administrative staff, controllers and technicians. That data could later train systems to take over some of their work, not only the work of people driving equipment. He put it this way: “The first generation of automation tried to replace our hands; the next is trying to replace our minds.”

This is our reading of the shift. Cranes are visible and expensive. A union can see one coming years ahead. A software upgrade is quieter. It can move planning work from a clerk’s desk into an algorithm without a single new machine on the quay. By naming TOS and AI directly, the IDC is telling operators that a software change will be treated like a crane order.

A movement that has grown fast

The IDC’s size has grown sharply in a short time. In July 2025, FreightWaves described the Lisbon-based council as having 92 organisations from 41 countries and over 100,000 affiliated members. The Rio figures put it at 108 unions and more than 220,000 dockworkers. The country count is slightly lower, at 39. The membership figure has more than doubled in about 16 months.

That growth followed a push by the IDC and the US-based International Longshoremen’s Association (ILA). The two groups held a “People Over Profits” anti-automation summit in Lisbon, which The Maritime Executive covered on 7 November 2025. It reported that union representatives from more than 60 countries attended. It also reported that the summit created a Global Maritime Alliance aimed at halting the spread of port automation and coordinating strike action.

At that summit, ILA President Harold J. Daggett said that if automation was pushed through, “we will confront it with a global strike of three to four weeks.” IDC international labour coordinator Jordi Aragunde said: “If their strategy is global, ours must be too.”

The Rio standards look like the next step. Lisbon set out the anger. Rio wrote it down as a common bargaining list.

What happened last time: the US East and Gulf Coast

Forwarders have seen this play out before. In October 2024 the ILA shut down container handling at East and Gulf Coast ports in a three-day strike, FreightWaves reported. The Maritime Executive put the 2024 action at 36 ports and more than 47,000 workers, over pay and automation.

The deal that ended it is close to what the IDC now wants worldwide. The six-year ILA master contract with the US Maritime Alliance (USMX) was ratified in February 2025. It is retroactive to 1 October 2024 and runs to 30 September 2030, according to Supply Chain Dive and The Maritime Executive. Members voted “nearly 99%” in favour, Supply Chain Dive reported.

Supply Chain Dive reported that the contract allows “no fully automated — defined as devoid of human interaction — terminals” during its term. It also reported, citing ILA executive vice president Dennis Daggett, that employers must engage with the union much earlier before buying any software, hardware or equipment. The Maritime Executive reported a 62% wage increase over the contract. It also cited AP and Bloomberg describing a compromise that lets operators adopt technology that does not affect jobs.

Even then, one lawyer quoted by Supply Chain Dive saw no end to the argument. “This will remain a point of contention moving forward with all negotiations,” said Melissa Atkins, a labour and employment lawyer at Obermayer.

Note the dates. The IDC’s standards cover 2026 to 2030. The ILA contract expires on 30 September 2030. The IDC’s next assembly is in 2030. In our view that lines up the next big round of US East and Gulf Coast talks with a global union campaign that will have had four years to organise.

What this means for forwarders

Here is our read for people moving boxes.

Terminal tech will move slower. Digital gate systems, truck appointment platforms, remote-controlled equipment and TOS upgrades are all now clearly in scope. Where IDC unions are strong, expect operators to negotiate before switching anything on. That adds months, not days, to many projects.

Promised visibility may slip. Many forwarders have been told better data feeds, faster gate times or automated booking are coming from terminals. Some of those depend on exactly the systems unions now want to vet. Build that slippage into customer promises.

Global operators are the stated target. The third phase names “international port companies”. These are groups that run terminals in many countries. A dispute at one of their sites is the kind of thing the IDC’s information-sharing and coordinated-response phases are designed to spread. We think the near-term risk is linked protests, slowdowns or solidarity actions at a few hubs, not a worldwide shutdown.

The 2030 calendar matters for long contracts. Shippers signing multi-year logistics deals that cover US East and Gulf Coast gateways should note 30 September 2030. Contingency routing via the West Coast, Canada or Mexico is worth writing into plans now, not in mid-2030.

Labour risk is now a technology risk. Forwarders and software firms selling into terminals should expect union questions about jobs and data. A tool that touches planning or gate work may need a labour plan, not just an IT plan.

Our prediction

Our call: by end of June 2027, at least one IDC-affiliated union will publicly cite the Rio standards to delay, pause or block a software or automation rollout at a major container terminal run by an international operator. We do not expect a coordinated multi-country port strike over automation before the end of 2027. The three-phase plan starts with information sharing, and the IDC has set no dates. The bigger test, in our view, comes in 2030, when the ILA contract expires in the same year the IDC’s 2026–2030 cycle closes.

Sources

Read us on Google? Add Forwarder News as a preferred source to see more of our stories in Top Stories.